Williams Creek About Page Dropdown Image

We Plan. We Build. We Maintain. WILLIAMS CREEK MANAGEMENT is committed to the principles of value-based construction and long-term maintenance of the built and natural systems within our communities.

Williams Creek Ravina Park Stream Bank Stabilization Project

From urban landscape creation to rural sediment maintenance, we design and build innovative and individualized solutions that meet regulatory requirements while enhancing our communities and rebuilding our natural world.

Williams Creek Markets Served Dropdown Image

Each of the markets we serve has a lasting impact on society. We build long-lasting relationships and high-quality solutions that are unique to clients’ projects for communities of all markets across the Midwest.

Brouilettes Creek Streambank Restoration

Owner: American Electric Power
Client: Indiana-Michigan Transmission Company, Inc.
LOCATION: Vermillion County, IN
Year: 2012
Brouilettes Creek Streambank Restoration

American Electric Power currently maintains in excess of 39,000 miles of transmission lines across the United States. AEP maintains the goal of protecting the system by minimizing outages, adverse environmental impacts, ensuring compliance with all applicable laws and regulations, performing its work as safely and economically as possible, and maintaining a positive relationship with land owners and the public. Williams Creek has continually assisted AEP with the implementation of natural system restoration for asset management protection.

Williams Creek provided full Design Build services, including ecological engineering and construction management services necessary to design, permit, and construct approximately 700 linear feet of streambank restoration in Vermillion County, Indiana. The primary purpose of the project was to stabilize a rapidly eroding section along the east bank of Brouillettes Creek near a 345 kV transmission tower.

Williams Creek designed and constructed bank modifications, including hard armoring the toe of slope to halt the near-term scouring, installation of rock barbs and j-hooks to return the centerline of the stream to its former location, and relaxing eroded slopes and stabilizing them with permanent turf reinforcement mats and native, herbaceous, and woody plant installation. Bank modifications returned the stream to its former centerline within 12 months and eliminated the threat of lost regional power, reduced localized sedimentation into the creek, and enhanced the riparian corridor to better support wildlife.

APPLICABLE SERVICES & MARKETS

KEY PROJECTS

WE’RE BETTER TOGETHER

Become a Client

Partner with us today to change how tomorrow looks by letting us serve your project to have a lasting impact on our world.
Contact Us

Charter Your Career

Our team loves what we do and is driven by how our work makes an impact on the communities we serve.

Join Our Team
[email protected](877) 935-6609
4620 S County Road 600 E
Plainfield, IN 46168

Williams Creek Management Corporation © 2023. All Rights Reserved. Privacy Policy

linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram